Eng. Ayman Eldakhky TTG manager of the Infrastructure and Rural Development Department , was working on behalf of the consultant office –ENVIRO CIVEC -for this project which its client: Al-Nasr Co. For Civil Works.
Project Description: The areas of the Suburbs are: 3600, 8000, 200 Acres respectively.
Project Location: East Suburb of Shubra Al-Khaima, Al-Haram & Al-Marg.
Job Description: Preparing the designs & studies for the renewal & rehabilitation of potable water networks in the regions previously mentioned. The pipelines diameter used in the network ranges from 150, 1200 mm, 150, 400mm with a length of about 180 km In Shoubra Al-Khaima, 130 km in Al-Haram & 195 km in Al-Marg.
The total flow rate in each station reaches 52000 m3 / day